Game Day Mystery Make-Along 2022 || 11 am Tunisian Crochet Play
Here is the Game Day Mystery Make-Along 2022 || 11 am Tunisian Crochet Play. If you missed any of the plays, go back to the original blog post and get all the details you need.
You must complete each previous part of the mystery project before you can move on to the next.
Remember, should you have any questions please be sure to post in the Marly’s Minions Facebook Group!
*This post contains affiliate links. By clicking one of these links and making a purchase a small portion of that purchase will go to support the blog. The price that you pay does not change. The small commission I make allows me to keep bringing you free patterns like this. Thank you for your continued support.*
SKILL LEVEL
Intermediate
MEASUREMENTS
Gauge
13 TSS and 13 rows = 4” [10 cm] x 4” [10 cm]; use any size hook to obtain the gauge.
MATERIALS
Yarn
Color A: #28420 Cobblestone Heather (NEUTRAL COLOR)
Color B: #28442 Peacock (Dark shade of color 1)
Color C: #28438 Mint (Light shade of color 1)
Color D: #26133 Caution (Dark shade of color 2)
Color E: #28424 Cream (Light shade of color 2)
Hook
Size K/10.5 (6.5 mm) with 16” [40.5 cm] cord
Notions
Tapestry needle, Stitch Marker
ABBREVIATIONS
Ch – Chain(s)
RS – Right Side
Sc – Single Crochet
Sc2tog – Single Crochet Two Together
St(s) – Stitch(es)
TSS- Tunisian Simple Stitch
TKS- Tunisian Knit Stitch
TPS- Tunisian Purl Stitch
TRS- Tunisian Reverse Stitch
WS – Wrong Side
Yo – yarn over
SPECIAL STITCHES
- Foundation Slip Stitch:
- First Stitch: Ch 1, insert hook into back ridge of chain, yarn over and pull up loop (2 loops on hook), yarn over and draw through 1 loop on hook (creates chain), draw through next loop on hook (creates slip stitch).
- Next Stitch: Insert hook into chain just created (vertical bar furthest from hook), yarn over and pull up a loop (2 loops on hook), yarn over and draw through both loops on hook (first loop creates chain, second creates slip stitch)
- Spike Stitch: Insert hook into front vertical bar and front horizontal bar at the same time of indicated stitch 2 rows below, yarn over from behind and pull up a loop, yarn over and draw through 1 loop on hook. (This creates a long “v” over the previous rows. You can make it as long or short as you like.)
- Tunisian Simple Stitch (TSS): Insert hook from right to left into front vertical bar of next st, yarn over and pull up a loop.
- Tunisian Purl Stitch (TPS): Move yarn to front of work, insert hook from right to left into front vertical bar of next st, yarn over from front and pull up a loop.
- Tunisian Knit Stitch (TKS): Insert hook from front to back between front and back vertical bar of next st (under horizontal bars), yarn over and pull up a loop.
- Tunisian Reverse Stitch (TRS): Insert hook from right to left into back vertical bar of next st on the wrong side (or back of work), yarn over and pull up a loop. This pushes the return pass to the front of the work creating a purl-like look.
- “Work Loops off as normal” Yarn over and draw through 1 loop on hook, *yarn over, pull through 2 loops on hook; repeat from * to end.
VIDEO TUTORIAL
On YouTube: https://youtu.be/-FEYohYoZyI
11 AM TUNISIAN CROCHET PLAY ????
Notes:
- First loop on hook counts as a stitch. Alway skip the rightmost st on the edge.
- If you do not enjoy working TRS or if you don’t like the look, you can do TSS for all TRS stitches throughout the pattern.
- Change color when there are 2 loops left on your hook at the end of a row. Pattern has you carry your yarn up the side, it is up to you if you want to do this or cut and join the new color each time.
See stitch diagram for assistance.
Row 5: Fwd: *Tss in next 3 sts, yo, skip next st; repeat from * across to last st, tss in last st. Rtn:Work loops off as normal, change color to C. (66 sts– Note: Don’t forget that yo count as a st)
Row 6: Fwd: *Trs in next 3 sts, yo, skip next st; repeat from * across to last st, tss in last st. Rtn: Work loops off as normal, change color to A.
Row 7: Fwd: *Trs in next 3 sts, spike st in next st 2 rows below (working over yo); repeat from * across to last st, tss in last st. Rtn: Work loops off as normal, change color to D.
Row 8: Fwd: Tss in next st, *yo, skip next st, tss in next 3 sts; repeat from * across. Rtn:Work loops off as normal, change color to E.
Row 9: Fwd: Trs in next st, yo, skip next st, *trs in next 3 sts, yo, skip next st; repeat from * across to last 3 sts, trs in next 2 sts, tss in last st. Rtn: Work loops off as normal, change color to A.
Row 10: Fwd: Trs in next st, spike st in next st 2 rows below, *trs in next 3 sts, spike st in next st 2 rows below; repeat from * across to last 3 sts, trs in next 2 sts, tss in last st. Rtn: Work loops off as normal, change color to B.
Finished Measurements: 3.25” [8.5 cm] tall by 20” [51 cm] wide
Next Play @ 1 pm!
Looking for the next clue? Head to the original blog post for all the details at 1 pm EST. Every two hours we will have a link to the new clue in that post.